Wheaton Precious Metals Announces Third Quarter 2026 Results and Record Year-to-Date Production, Sales Volume, Revenue, Earnings and Cash Flow

PR Newswire

VANCOUVER, BC, Nov. 5, 2026

VANCOUVER, BC, Nov. 5, 2026 /PRNewswire/ -- "Wheaton delivered another solid quarter, building on record year-to-date performance, and remains very well positioned to achieve our annual production guidance," said Haytham Hodaly, President and Chief Executive Officer of Wheaton Precious Metals. "We continued to see meaningful progress on our growth pipeline, with first gold pour at Montage Gold's Koné project and Hudbay's approval of construction at Copper World marking important milestones for two significant contributors to our near-term growth. With a portfolio of high-quality assets and increasing visibility into our next phase of growth, supported by a strong financial position, we are confident in Wheaton's outlook and our ability to deliver meaningful production growth over the coming years."

Record Financial Performance and Strong Balance Sheet

High-Quality Asset Base

Operational Overview 

(all figures in US dollars unless     
otherwise noted)



Q3 2026  



Q3 2025  


Change



YTD 2026  



YTD 2025  



Change

Units produced


















Gold ounces



91,753



99,943


(8.2) %



279,448



285,495



(2.1) %

Silver ounces



8,182



5,995


36.5 %



21,346



16,270



31.2 %

Other metals GEOs 3



2,846



3,972


(28.3) %



12,053



11,747



2.6 %

Total GEOs 3



230,965



203,835


13.3 %



647,258



568,405



13.9 %

Units sold


















Gold ounces



91,969



78,944


16.5 %



283,140



289,214



(2.1) %

Silver ounces



5,758



4,760


21.0 %



17,329



14,111



22.8 %

Other metals GEOs 3



4,334



3,566


21.5 %



11,170



8,354



33.7 %

Total GEOs 3



192,270



161,845


18.8 %



583,129



532,756



9.5 %

Change in PBND


















Gold equivalent ounces 3



16,984



24,427


7,443



5,557



(13,004)



(18,561)

Revenue


$

771,734


$

476,257


62.0 %


$

2,602,404


$

1,449,886



79.5 %

Net earnings


$

410,248


$

367,216


11.7 %


$

1,535,528


$

913,471



68.1 %

Per share


$

0.903


$

0.809


11.6 %


$

3.381


$

2.013



68.0 %

Adjusted net earnings 1


$

409,840


$

281,054


45.8 %


$

1,535,154


$

817,884



87.7 %

Per share 1


$

0.902


$

0.619


45.7 %


$

3.381


$

1.802



87.6 %

Operating cash flows


$

644,856


$

382,953


68.4 %


$

2,060,196


$

1,158,705



77.8 %

Per share 1


$

1.420


$

0.844


68.2 %


$

4.537


$

2.553



77.7 %

All amounts in thousands except gold & gold equivalent ounces, and per share amounts.

Financial Review

Revenues

Revenue in Q3 2026 was $772 million (51% gold, 46% silver, 0.5% palladium and 2% cobalt), with the $295 million increase relative to the prior period being primarily due to a 36% increase in the average realized gold equivalent³ price; and a 19% increase in the number of GEOs³ sold.

Revenue was $2.6 billion (49% gold, 49% silver, 0.4% palladium and 2% cobalt) during the nine months ended September 30, 2026, with the $1.2 billion increase from the comparable period of the previous year due primarily to a 64% increase in the average realized gold equivalent³ price; and a 9% increase in the number of GEOs³ sold.

Cash Costs and Margins

Average cash costs1 in Q3 2026 were $548 per GEO³ as compared to $452 in Q3 2025. This resulted in a cash operating margin1 of $3,466 per GEO³ sold, an increase of 39% as compared with the third quarter of 2025, a result of the higher realized price per ounce. Notably, year-over-year margin growth exceeded the appreciation in gold prices over the same period, underscoring the effectiveness of Wheaton's business model in generating higher levered cash flow and margins in a rising precious metals price environment.

Average cash costs1 for the nine months ended September 30, 2026 were $597 per GEO³ as compared to $415 in the comparable period of the previous year. This resulted in a cash operating margin1 of $3,866 per GEO³ sold, a 68% increase from the comparable period of the previous year, a result of the higher realized price per ounce.

Cash Flow from Operations

Operating cash flow in Q3 2026 amounted to $645 million, with the $262 million increase from the comparable period of the prior year being due primarily to higher gross margin.

Operating cash flows for the nine months ended September 30, 2026 amounted to $2.1 billion, with the $901 million increase from the comparable period of the previous year being due primarily to higher gross margin.

Produced But Not Yet Delivered

As at September 30, 2026, approximately 178,600 GEOs3 were produced but not yet delivered ("PBND") representing approximately 2.6 months of payable production, consistent with the preceding four quarters and placing PBND levels within our guided range of two and a half to three and a half months.

Balance Sheet (at September 30, 2026)

Third Quarter Operating Asset Highlights

Salobo: In Q3 2026, Salobo produced 65,800 ounces of attributable gold, a decrease of 2% relative to Q3 2025, primarily the result of lower grades due to mine sequencing, partially offset by higher recoveries and throughput.

Antamina: In Q3 2026, Antamina produced 2.7 million ounces of attributable silver, an increase of 60% relative to Q3 2025. The increase was primarily driven by the newly acquired BHP Antamina PMPA, which increased the Company's share of silver production at Antamina from 33.75% to 67.5%, effective April 1, 2026. The benefit of the increased production share was partially offset by lower silver grades. The lower grades were attributable to pit sequencing, with a greater proportion of copper-only ore processed during the quarter relative to copper-zinc ore, which contains more silver.

Peñasquito: In Q3 2026, Peñasquito produced a record 3.1 million ounces of attributable silver, an increase of 46% relative to Q3 2025, primarily the result of higher throughput and grades resulting from planned mine sequencing.

San Dimas: In Q3 2026, San Dimas produced 5,700 ounces of attributable gold, a decrease of 25% relative to Q3 2025, primarily the result of lower throughput due to the impact of a labour dispute which began on September 18, 2026, partially offset by the change of the gold to silver conversion ratio from 90:1 to 70:1 on October 29, 2025, noting that for the period April 30, 2025 to October 28, 2025, the gold to silver conversion ratio was 90:1.

Blackwater: In Q3 2026, Blackwater produced 0.2 million ounces of attributable silver and 5,600 ounces of attributable gold, an increase of 14% for both metals relative to Q3 2025, primarily the result of higher recoveries as a result of process optimization of the milling circuit and improved ore characteristics as mining has advanced deeper into the deposit, partially offset by lower throughput and grades. On October 13, 2026, Artemis Gold Inc. ("Artemis Gold") reported that the Phase 1A expansion project at Blackwater, expected to increase annual design throughput of the existing process plant by 33% to 8 Mtpa, was now 77% complete and remains on track for commissioning before the end of the year, with the expansion expected to contribute to production beginning in 2027. Artemis Gold reports major works construction on the Expanded Phase 2 project is progressing as planned, and that together, these expansions are expected to more than triple current processing capacity.

Sudbury: In Q3 2026, Vale's Sudbury mines produced 4,000 ounces of attributable gold, a decrease of 18% relative to Q3 2025, with lower grades and recoveries being partially offset by higher throughput.

Constancia: In Q3 2026, Constancia produced 0.6 million ounces of attributable silver and 3,200 ounces of attributable gold, consistent with prior year for silver and a decrease of 75% for gold production relative to Q3 2025. The lower gold production was the result of lower grades and recoveries, as mining activities in the higher-gold grade Pampacancha pit were completed during Q4 2025, and the remaining stockpiled Pampacancha ore was fully processed during January 2026. On July 2, 2026, Hudbay Minerals ("Hudbay") announced that it had received approval from the National Environmental Certification Service for Sustainable Investments in Perú ("SENACE") to amend its environmental permit and further increase annual mill processing capacity at Constancia. The amended permit increases the processing capacity of the Constancia mill to 34 million tonnes of ore per annum from the previously permitted 31 million tonnes per annum. Hudbay states that the environmental permit amendment also approves further optimization of the mine plan, extends the operational life of Constancia, and incorporates the implementation of additional infrastructure to improve tailings transport infrastructure and water management systems.

Stillwater: In Q3 2026, the Stillwater mines produced 1,200 ounces of attributable gold and 2,100 ounces of attributable palladium, a decrease of 30% for gold and 19% for palladium relative to Q3 2025, primarily the result of lower throughput, grades and recoveries  with operations being impacted by a labour dispute which lasted from September 3, 2026 to October 9, 2026.

Voisey's Bay: In Q3 2026, the Voisey's Bay mine produced 403,000 pounds of attributable cobalt, a decrease of 33% relative to Q3 2025 primarily the result of planned maintenance.

Other Gold: In Q3 2026, total Other Gold attributable production was 6,200 ounces, an increase of 418% relative to Q3 2025 due to the addition of attributable production from the Fenix and Hemlo mines. Notable operational updates for assets included within 'Other Gold' include:

Other Silver: In Q3 2026, total Other Silver attributable production was 1.7 million ounces, an increase of 13% relative to Q3 2025.

Detailed mine-by-mine production and sales figures can be found in the Appendix to this press release and in Wheaton's consolidated MD&A in the 'Results of Operations and Operational Review' section.

Recent Development Asset Updates

Platreef: On November 3, 2026, Ivanhoe Mines ("Ivanhoe") announced that Platreef's Phase 1 concentrator continued to ramp-up during the quarter, fed by lower-grade development ore, and that identified bottlenecks in the underground materials handling and tailings filtration systems have largely been resolved, with mining and milling rates expected to improve further in the fourth quarter. Ivanhoe notes that the production mining of higher-grade stopes is also expected to ramp up in Q4 2026. Ivanhoe also reported that Shaft #3 is now also hoisting development waste, as the underground infrastructure is constructed in preparation for the Phase 2 expansion, which is expected to be completed by the end of 2027.

Fenix: On September 28, 2026, Rio2 Limited ("Rio2") provided an update that despite the temporary suspension of mining activities due to adverse weather conditions, critical facilities including leach pad, processing plant, and power generation facilities remain operational at reduced capacity. Rio2 reports it believes that the ramp-up of mining activities remains on track to achieve commercial production in Q4 2026 with Rio2 implementing several initiatives to recover production losses incurred over the recent months.

Koné: On November 4, 2026, Montage Gold Corp. ("Montage") reported that following the first gold pour at the Koné project which was achieved on September 26, 2026, activities have rapidly ramped up with commercial production well on track to be declared in Q4 2026. Montage reported that a total of approximately 880,000 tonnes were processed from the oxide circuit during the month of October, with the plant operating at an average of over 90% of its 11Mtpa nameplate capacity during the month, with 104% of nameplate achieved during the last week of October. Montage also confirmed that construction of the hard-rock comminution circuit remains on track for completion in Q2 2027.

Kurmuk: On September 17, 2026, Allied Gold Corporation ("Allied") reported that the power line connecting Kurmuk to the Ethiopian electrical grid had been successfully commissioned and energized, marking a significant milestone toward the start of operations. Subsequently, on November 4, 2026, Allied reported that ore has been introduced into the processing plant and the mine is now in production.

El Domo: On November 3, 2026, Silvercorp Metals Inc. ("Silvercorp") announced that, due to extended rainfall, the El Domo completion date is expected to be delayed by four months, with Silvercorp targeting production by November 1, 2027. In addition, Silvercorp reported that construction of the external powerline has been delayed pending additional reviews and approvals, with construction of the site substation having commenced.

Copper World: On October 21, 2026, Hudbay announced the results of the definitive feasibility study and approved the Copper World project construction, advancing the next major U.S. copper mine with first production targeted for the second half of 2029, and an expansion of the concentrator from 60,000 to 90,000 tpd planned for year five. Copper World represents a significant contributor to the Company's growth profile.

Jervois: On October 15, 2026, KGL Resources ("KGL") announced the receipt of board approval for the final investment decision for its Jervois Project. KGL reported that the target delivery date for first concentrate production remains the first half of 2028.

Spring Valley: During the quarter, Solidus Resources received the Water Pollution Control Permit from the Bureau of Mining Regulation and Reclamation of the Nevada Division of Environmental Protection for the Spring Valley Project. On October 21, 2026, following receipt of the permit, the Company advanced a portion of the upfront payment amounting to $35 million, with the remaining balance to be advanced in installments subject to the satisfaction of various conditions.

Santo Domingo: On October 29, 2026, Capstone Copper Corp. ("Capstone") reported that detailed engineering advanced during the third quarter, alongside continued evaluation of opportunities to optimize district infrastructure.

Subsequent to the quarter, Capstone also reported that it had continued to advance Santo Domingo towards a final investment decision expected in Q1 2027, upon which fund entities managed by Orion Resource Partners LP will acquire a 25% ownership interest in the Santo Domingo project under a joint venture transaction. Capstone noted that the transaction de-risks capital funding requirements for Santo Domingo, providing financial flexibility during project construction.

Marathon: On October 1, 2026, Generation Mining Ltd. ("Gen Mining") announced that it has commenced construction at its Marathon Project, following the earlier announcement that it had secured final funding. Early works have commenced and are expected to run through Q4 2026 and into 2027, alongside the advancement of critical equipment and infrastructure procurement.

Toroparu: On November 4, 2026, Aris reported that the Prefeasibility Study ("PFS") remains on schedule for completion in November 2026, supporting a construction decision targeted for early 2027. Project optimization work in support of the PFS includes updated mine scheduling, engineering studies and other activities to advance to construction readiness.

Kudz Ze Kayah: On October 26, 2026, BMC Minerals Ltd ("BMC") reported receipt of the Type B Water License from the Yukon Water Board during the quarter and that it continues to advance the remaining permits. BMC noted that it continues to aim to make a final investment decision in late 2027, subject to receipt of permits.

Corporate Development

Salobo: During the quarter, the Company amended the Salobo PMPA to pay Vale $40 million in two installments in connection with the Coarse Particle Flotation ("CPF") project milestones. The CPF project will reduce grinding requirements through the addition of a new flotation circuit that removes waste rock earlier.  The CPF project is expected to add 6 Mt to the Salobo plant's annual ore processing capacity, bringing overall processing capacity to 42 Mtpa. The amendment eliminated the Company's previous obligation to make annual payments of $8 million over a 10-year period, totaling $80 million, if Vale had implemented a high-grade mine plan at Salobo.

Cozamin: On September 21, 2026, Luca Mining Corp. ("Luca") reported a definitive agreement to acquire the Cozamin mine from Capstone. To assist Luca in financing this acquisition, the Company agreed with Luca to amend the existing Cozamin PMPA concurrently with the closing of the acquisition to provide for an additional $25 million upfront cash consideration. Under the terms of the amendment, which is conditional on the completion of the acquisition of Cozamin by Luca, the Company's silver entitlement is to be increased from 50% to 65% of payable production until an incremental 500,000 ounces are delivered, after which the stream reverts to the percentages and thresholds under the original Cozamin PMPA.

Sustainability

Future of Mining Challenge

During the quarter, ventures were shortlisted to advance in the Future of Mining Challenge and are now being evaluated for scalable technologies aimed at improving ore body understanding and extraction, minimizing land disturbance and creating operational efficiencies at mine sites. Three finalists are expected to be announced in February ahead of the Challenge showcase and winner selection in March 2027.

Partner Community Investment

Local Community Investment

2026 and Long-Term Production Outlook

Wheaton's estimated attributable production in 2026 is forecast to be 400,000 to 430,000 ounces of gold, 27 to 29 million ounces of silver, and 19,000 to 21,000 GEOs of other metals, resulting in annual production of approximately 860,000 to 940,000 GEOs3, unchanged from previous guidance. Approximately 3% of the Company's forecast 2026 production is estimated to be delivered from assets currently in construction or various stages of ramp-up.

Annual production is currently forecast to increase from 2025 levels by approximately 50% to 1,200,000 GEOs3 by 2030, with average annual production forecast to remain at 1,200,000 GEOs3 in years 2031 to 2035, also unchanged from previous guidance.

About Wheaton Precious Metals Corp.

Wheaton is the world's premier precious metals streaming company with the highest-quality portfolio of long-life, low-cost assets. Its business model offers investors commodity price leverage and exploration upside but with a much lower risk profile than a traditional mining company. Wheaton delivers amongst the highest cash operating margins in the mining industry, allowing it to pay a competitive dividend and continue to grow through accretive acquisitions. Wheaton is committed to strong sustainability practices and giving back to the communities where Wheaton and its mining partners operate. Wheaton creates sustainable value through streaming for all of its stakeholders.

In accordance with Wheaton Precious MetalsTM Corp.'s ("Wheaton Precious Metals", "Wheaton" or the "Company") MD&A and Financial Statements, reference to the Company and Wheaton includes the Company's wholly owned subsidiaries.

Webcast and Conference Call Details

Wheaton will release its 2026 third quarter results on Thursday, November 5, 2026, after market close. A conference call will be held on Friday, November 6, 2026, starting at 11:00 am ET (9:00 am PT) to discuss these results. To participate in the live call, please use one of the following methods:

RapidConnect URL:                                    Click here
Live webcast:                                              Click here
Dial toll free:                                                1-800-715-9871 or 1-647-932-3411
Conference Call ID:                                     7288291#

Participants should dial in five to ten minutes before the call.

The conference call will be recorded and available until November 13, 2026, at 11:59 pm ET. The webcast will be available for one year. You can listen to an archive of the call by one of the following methods:

Dial toll free from Canada or the US:          1-800-770-2030
Dial from outside Canada or the US:          1-647-362-9199
Passcode:                                                    7288291#
Archived webcast:                                       Click here

This earnings release should be read in conjunction with Wheaton Precious Metals' MD&A and Financial Statements, which are available on the Company's website at www.wheatonpm.com and have been posted on SEDAR+ at www.sedarplus.ca. 

Wheaton Precious Metals believes that there are no significant differences between its corporate governance practices and those required to be followed by United States domestic issuers under the NYSE listing standards. This confirmation is located on the Wheaton Precious Metals website at www.wheatonpm.com. 

Condensed Interim Consolidated Statements of Earnings



Three Months Ended
September 30

Nine Months Ended
September 30

(US dollars and shares in thousands, except per share     
amounts - unaudited)


2026

2025

2026

2025

Sales


$

771,734

$

476,257

$

2,602,404

$

1,449,886

Cost of sales










Cost of sales, excluding depletion


$

105,337

$

74,303

$

349,423

$

224,107

Depletion



127,893


65,966


327,247


217,662

Total cost of sales


$

233,230

$

140,269

$

676,670

$

441,769

Gross margin


$

538,504

$

335,988

$

1,925,734

$

1,008,117

General and administrative



10,225


10,424


34,524


34,970

Share based compensation



13,528


8,652


28,447


30,795

Donations and community investments



3,740


1,406


9,902


6,466

Earnings from operations


$

511,011

$

315,506

$

1,852,861

$

935,886

Gain on disposal of mineral stream interests



-


85,724


-


85,724

Other income (expense)



1,761


12,834


28,568


30,090

Earnings before finance costs and income taxes

$

512,772

$

414,064

$

1,881,429

$

1,051,700

Finance costs



25,097


1,441


57,599


4,309

Earnings before income taxes


$

487,675

$

412,623

$

1,823,830

$

1,047,391

Income tax expense



77,427


45,407


288,302


133,920

Net earnings


$

410,248

$

367,216

$

1,535,528

$

913,471

Basic earnings per share


$

0.903

$

0.809

$

3.381

$

2.013

Diluted earnings per share


$

0.902

$

0.807

$

3.375

$

2.009

Weighted average number of shares outstanding










Basic



454,171


453,967


454,117


453,850

Diluted



455,030


454,768


454,992


454,625

Condensed Interim Consolidated Balance Sheets


As at
September 30

As at
December 31

(US dollars in thousands - unaudited)

2026

2025

Assets





Current assets





Cash and cash equivalents

$

145,802

$

1,153,593

Accounts receivable


13,904


46,723

Other


3,134


3,853

Total current assets

$

162,840

$

1,204,169

Non-current assets





Mineral stream interests

$

11,689,979

$

7,397,149

Early deposit mineral stream interests


47,097


47,094

Mineral royalty interests


67,689


40,421

Long-term equity investments


202,571


410,495

Property, plant and equipment


9,409


9,926

Other


42,636


16,527

Total non-current assets

$

12,059,381

$

7,921,612

Total assets

$

12,222,221

$

9,125,781

Liabilities





Current liabilities





Accounts payable and accrued liabilities

$

16,441

$

22,557

Income taxes payable


246,555


109,951

Current portion of performance share units     


22,029


21,604

Current portion of lease liabilities


600


575

Total current liabilities

$

285,625

$

154,687

Non-current liabilities





Bank debt

$

1,597,518

$

-

Performance share units


6,323


13,215

Lease liabilities


6,715


7,330

Income taxes payable - non-current


254,860


252,271

Deferred income taxes


34,779


1,794

Pension liability


4,397


5,976

Total non-current liabilities

$

1,904,592

$

280,586

Total liabilities

$

2,190,217

$

435,273

Shareholders' equity





Issued capital

$

3,827,121

$

3,814,910

Reserves


102,870


176,911

Retained earnings


6,102,013


4,698,687

Total shareholders' equity

$

10,032,004

$

8,690,508

Total liabilities and shareholders' equity

$

12,222,221

$

9,125,781

Condensed Interim Consolidated Statements of Cash Flows



Three Months Ended
September 30

Nine Months Ended
September 30

(US dollars in thousands - unaudited)


2026

2025

2026

2025

Operating activities










Net earnings


$

410,248

$

367,216

$

1,535,528

$

913,471

Adjustments for










Depreciation and depletion



128,198


66,273


328,289


218,589

Gain on disposal of mineral stream interest



-


(85,724)


-


(85,724)

Equity settled share based compensation



1,770


1,612


5,160


4,846

Performance share units - expense



11,758


7,040


23,287


25,949

Performance share units - paid



-


-


(29,257)


(17,209)

Income tax expense



77,427


45,407


288,302


133,920

Investment income recognized in net earnings



(1,659)


(9,957)


(17,330)


(27,746)

Other



25,378


(470)


47,544


2,701

Change in non-cash working capital



13,328


(17,512)


23,236


(31,963)

Cash generated from operations before income taxes and interest     


$

666,448

$

373,885

$

2,204,759

$

1,136,834

Income taxes paid



(72)


(422)


(109,515)


(3,604)

Interest paid



(22,974)


(132)


(52,860)


(310)

Interest received



1,454


9,622


17,812


25,785

Cash generated from operating activities


$

644,856

$

382,953

$

2,060,196

$

1,158,705

Financing activities










Bank debt repaid


$

(372,000)

$

-

$

(1,100,000)

$

-

Bank debt drawn



-


-


2,700,000


-

Debt issue costs



(37)


(93)


(5,155)


(955)

Share purchase options exercised



996


1,942


2,542


6,415

Lease payments



(140)


(127)


(423)


(338)

Dividends paid



(87,673)


(74,232)


(258,965)


(222,171)

Cash (used for) generated from financing activities


$

(458,854)

$

(72,510)

$

1,337,999

$

(217,049)

Investing activities










Mineral stream interests


$

(86,667)

$

(250,630)

$

(4,621,850)

$

(694,321)

Early deposit mineral stream interests



-


-


(3)


-

Mineral royalty interests



(194)


-


(27,268)


-

Net proceeds on disposal of mineral stream interests



-


101,730


-


101,730

Acquisition of long-term investments



(37,642)


(9,711)


(52,249)


(9,714)

Proceeds on disposal of long-term investments



-


-


323,421


-

Dividends received



-


239


-


765

Other



(15,089)


(231)


(21,922)


(722)

Cash used for investing activities


$

(139,592)

$

(158,603)

$

(4,399,871)

$

(602,262)

Effect of exchange rate changes on cash and cash equivalents


$

(800)

$

(19)

$

(6,115)

$

146

Increase (decrease) in cash and cash equivalents


$

45,610

$

151,821

$

(1,007,791)

$

339,540

Cash and cash equivalents, beginning of period


100,192


1,005,885


1,153,593


818,166

Cash and cash equivalents, end of period


$

145,802

$

1,157,706

$

145,802

$

1,157,706

Summary of Units Produced


Q3 2026   

Q2 2026  

Q1 2026   

Q4 2025   

Q3 2025   

Q2 2025   

Q1 2025   

Q4 2024   

Gold ounces produced ²









Salobo

65,769

62,116

69,201

88,907

66,997

69,418

71,384

84,291

Sudbury 3

3,963

4,736

4,115

7,412

4,852

5,403

4,880

5,259

Constancia

3,166

2,978

4,571

15,396

12,797

4,604

4,876

18,727

San Dimas 4

5,668

6,890

7,341

8,206

7,507

6,987

8,416

7,263

Stillwater 5

1,207

1,423

1,424

1,518

1,717

1,654

1,339

2,166

Blackwater

5,564

5,925

4,954

5,479

4,879

4,050

1,017

-

Platreef

230

81

76

-

-

-

-

-

Other









Marmato

476

979

816

705

807

748

757

622

Goose

1,161

362

1,096

1,027

387

19

-

-

Hemlo

2,596

2,561

3,007

1,630

-

-

-

-

Fenix

1,953

1,988

1,055

-

-

-

-

-

Total Other

6,186

5,890

5,974

3,362

1,194

767

757

622

Total gold ounces produced

91,753

90,039

97,656

130,280

99,943

92,883

92,669

118,328

Silver ounces produced 2









Peñasquito

3,056

1,807

2,559

1,821

2,087

2,103

1,754

2,465

Antamina

2,670

2,319

1,553

1,600

1,672

1,482

1,047

1,071

Constancia

577

565

531

731

577

552

555

970

Blackwater

189

201

169

186

166

138

35

-

Other









Los Filos 6

-

-

-

-

-

-

68

29

Zinkgruvan

640

438

532

513

688

684

585

637

Neves-Corvo

481

461

483

549

431

449

459

494

Aljustrel 7

347

461

691

548

195

-

-

-

Cozamin

159

161

165

170

169

174

174

192

Marmato

5

10

8

8

10

8

8

7

Mineral Park

58

31

19

8

-

-

-

-

Total Other

1,690

1,562

1,898

1,796

1,493

1,315

1,294

1,359

Total silver ounces produced

8,182

6,454

6,710

6,134

5,995

5,590

4,685

5,865

Palladium ounces produced ²









Stillwater 5

2,134

2,513

2,561

2,519

2,650

2,435

2,661

2,797

Platreef

94

31

30

-

-

-

-

-

Total palladium ounces produced

2,228

2,544

2,591

2,519

2,650

2,435

2,661

2,797

Platinum ounces produced ²









Platreef

121

42

40

-

-

-

-

-

Cobalt pounds produced ²









Voisey's Bay

403

796

657

670

604

647

540

393

GEOs produced 8

230,965

202,561

213,732

236,794

203,835

190,179

174,391

218,993

Average payable rate 2









Gold

95.0 %

95.1 %

95.3 %

95.0 %

94.6 %

95.2 %

94.9 %

95.3 %

Silver

87.3 %

87.0 %

87.8 %

87.5 %

87.7 %

87.7 %

86.3 %

84.6 %

Palladium

98.1 %

98.1 %

98.2 %

96.9 %

96.7 %

97.4 %

96.4 %

97.5 %

Platinum

80.0 %

80.0 %

80.0 %

n.a.

n.a.

n.a.

n.a.

n.a.

Cobalt

93.3 %

93.3 %

93.3 %

93.3 %

93.3 %

93.3 %

93.3 %

93.3 %

GEOs 8

90.4 %

90.8 %

91.4 %

91.7 %

91.2 %

91.5 %

91.1 %

90.5 %

1)

All figures in thousands except gold, palladium and platinum ounces produced.

2)

Quantity produced represents the amount of gold, silver, palladium, platinum and cobalt contained in concentrate or doré prior to smelting or refining deductions. Production figures and payable rates are based on information provided by the operators of the mining operations to which the mineral stream interests relate or management estimates in those situations where other information is not available. Certain production figures and payable rates may be updated in future periods as additional information is received.

3)

Comprised of the Coleman, Copper Cliff, Garson, Creighton, Stobie and Totten gold interests.

4)

Under the terms of the San Dimas PMPA, the Company is entitled to an amount equal to 25% of the payable gold production plus an additional amount of gold equal to 25% of the payable silver production converted to gold at a fixed gold to silver exchange ratio of 70:1 from the San Dimas mine. If the average gold to silver price ratio decreases to less than 50:1 or increases to more than 90:1 for a period of 6 months or more, then the "70" shall be revised to "50" or "90", as the case may be, until such time as the average gold to silver price ratio is between 50:1 to 90:1 for a period of 6 months or more in which event the "70" shall be reinstated. From April 30, 2025 to October 28, 2025, the fixed gold to silver exchange ratio was revised to 90:1. Effective October 29, 2025, the fixed gold to silver exchange ratio was returned to 70:1.  For reference, attributable silver production from prior periods is as follows: Q3 2026 - 215,000 ounces; Q2 2026 - 266,000 ounces; Q1 2026 - 294,000 ounces; Q4 2025 - 329,000 ounces; Q3 2025 - 364,000 ounces; Q2 2025 - 311,000 ounces; Q1 2025 - 340,000 ounces; Q4 2024 - 295,000 ounces.

5)

Comprised of the Stillwater and East Boulder gold and palladium interests.

6)

On April 1, 2025, Equinox Gold Corp., reported it has indefinitely suspended operations at Los Filos following the expiry of its land access agreement with the community of Carrizalillo on March 31, 2025.

7)

On September 12, 2023, it was announced that the production of the zinc and lead concentrates at the Aljustrel mine will be halted from September 24, 2023 until the third quarter of 2025.

8)

GEOs, which are provided to assist the reader, are based on the following commodity price assumptions: $4,800 per ounce gold; $80.00 per ounce silver; $1,500 per ounce palladium; $2,000 per ounce platinum; and $25.00 per pound cobalt; consistent with those used in estimating the Company's production guidance for 2026. 

Summary of Units Sold


Q3 2026 

Q2 2026 

Q1 2026 

Q4 2025 

Q3 2025 

Q2 2025 

Q1 2025 

Q4 2024 

Gold ounces sold









Salobo

63,243

70,106

58,675

83,697

55,768

76,331

83,809

55,170

Sudbury 2

4,112

4,471

4,412

3,715

4,729

2,849

5,632

4,048

Constancia

2,844

2,990

10,886

17,029

2,708

6,827

9,788

17,873

San Dimas

7,411

5,984

7,670

8,686

6,655

7,235

8,962

6,990

Stillwater 3

1,599

1,275

1,394

1,790

1,465

1,386

1,947

2,410

Blackwater

5,365

6,246

4,914

5,225

6,463

3,291

110

-

Platreef

95

-

-

-

-

-

-

-

Other









Marmato

972

864

718

809

749

742

737

650

Goose

544

859

1,339

528

95

-

-

-

Hemlo

3,155

2,283

4,478

-

-

-

-

-

Fenix

2,629

1,021

274

-

-

-

-

-

Santo Domingo 4

-

-

312

312

312

312

312

312

El Domo 4

-

-

-

-

-

-

-

209

Total Other

7,300

5,027

7,121

1,649

1,156

1,054

1,049

1,171

Total gold ounces sold

91,969

96,099

95,072

121,791

78,944

98,973

111,297

87,662

Silver ounces sold









Peñasquito

1,982

2,723

1,444

1,878

1,609

2,112

1,976

1,852

Antamina

2,041

2,063

1,504

1,893

1,552

1,073

884

858

Constancia

512

453

674

613

275

625

730

797

Blackwater

147

136

127

137

137

143

-

-

Other









Los Filos

-

2

7

-

3

8

57

29

Zinkgruvan

488

451

347

358

708

520

446

452

Neves-Corvo

197

203

271

245

212

224

218

154

Aljustrel

201

312

505

382

122

-

-

-

Cozamin

143

147

149

169

133

154

164

158

Marmato

10

9

8

10

9

9

8

7

Mineral Park

37

23

13

-

-

-

-

-

Total Other

1,076

1,147

1,300

1,164

1,187

915

893

800

Total silver ounces sold

5,758

6,522

5,049

5,685

4,760

4,868

4,483

4,307

Palladium ounces sold









Stillwater 3

2,747

2,069

2,906

1,730

2,594

2,575

2,457

4,434

Platreef

34

-

-

-

-

-

-

-

Total palladium ounces sold

2,781

2,069

2,906

1,730

2,594

2,575

2,457

4,434

Platinum ounces sold









Platreef

49

-

-

-

-

-

-

-

Cobalt pounds sold









Voisey's Bay

661

705

309

485

529

353

265

485

GEOs sold 5

192,270

209,115

181,743

219,605

161,845

182,750

188,162

163,355

Cumulative payable units PBND 6     









Gold ounces

91,964

96,409

106,873

108,525

106,222

90,284

100,512

123,511

Silver ounces

4,675

3,290

4,198

3,358

3,677

3,178

3,145

3,583

Palladium ounces

4,619

5,228

4,803

5,169

4,424

4,414

4,596

4,439

Platinum ounces

113

65

32

-

-

-

-

-

Cobalt pounds

1,398

1,683

1,646

1,341

1,202

1,168

917

678

GEOs 5

178,648

161,665

186,928

173,091

175,140

150,713

159,136

188,144

1)

All figures in thousands except gold, palladium and platinum ounces sold.

2)

Comprised of the Coleman, Copper Cliff, Garson, Creighton, Stobie and Totten gold interests.

3)

Comprised of the Stillwater and East Boulder gold and palladium interests.

4)

The ounces sold under Santo Domingo and El Domo relate to ounces received due to the delay ounce provision as per the respective PMPA. Please see the Company's MD&A for more information.

5)

GEOs, which are provided to assist the reader, are based on the following commodity price assumptions: $4,800 per ounce gold; $80.00 per ounce silver; $1,500 per ounce palladium; $2,000 per ounce platinum; and $25.00 per pound cobalt; consistent with those used in estimating the Company's production guidance for 2026.

6)

Payable gold, silver, palladium and platinum ounces as well as cobalt pounds produced but not yet delivered ("PBND") are based on management estimates. These figures may be updated in future periods as additional information is received. 

Results of Operations 

The operating results of the Company's reportable operating segments are summarized in the tables and commentary below.

Three Months Ended September 30, 2026



Units
Produced²

Units
Sold


Average
Realized
Price
($'s Per
Unit)


Average
Cash
Cost
($'s Per
Unit) 3


Average
Depletion
($'s Per
Unit) 4


Sales


Net
Earnings


Cash Flow
From
Operations


Total
Assets

Gold

















Salobo

65,769

63,243

$

4,267

$

433

$

414

$

269,890

$

216,285

$

242,497

$

2,542,453

Sudbury 5

3,963

4,112


4,305


400


1,326


17,701


10,605


16,037


200,616

Constancia

3,166

2,844


4,267


431


333


12,138


9,963


10,911


46,641

San Dimas

5,668

7,411


4,267


650


441


31,628


23,547


26,813


116,105

Stillwater

1,207

1,599


4,267


764


551


6,824


4,722


5,602


201,800

Blackwater

5,564

5,365


4,305


1,507


624


23,096


11,665


14,791


320,936

Platreef

230

95


4,267


100


657


407


335


397


275,640

Other 6

6,186

7,300


4,286


838


1,081


31,286


17,285


25,173


1,726,029


91,753

91,969

$

4,273

$

549

$

523

$

392,970

$

294,407

$

342,221

$

5,430,220

Silver

















Peñasquito

3,056

1,982

$

63.02

$

4.62

$

4.73

$

124,925

$

106,389

$

115,768

$

176,277

Antamina

2,670

2,041


63.02


12.93


26.30


128,628


48,557


102,231


4,654,655

Constancia

577

512


63.02


6.36


6.72


32,249


25,557


28,996


140,721

Blackwater

189

147


63.97


12.57


9.10


9,400


6,215


7,759


164,184

Other 7

1,690

1,076


58.11


9.48


4.54


62,536


47,449


65,777


572,019


8,182

5,758

$

62.13

$

8.83

$

12.63

$

357,738

$

234,167

$

320,531

$

5,707,856

Palladium

















Stillwater

2,134

2,747

$

1,326

$

235

$

481

$

3,642

$

1,676

$

2,997

$

205,123

Platreef

94

34


1,326


392


324


45


21


31


78,803


2,228

2,781

$

1,326

$

236

$

479

$

3,687

$

1,697

$

3,028

$

283,926

Platinum

















Marathon

-

-

$

n.a.

$

n.a.

$

n.a.

$

-

$

-

$

-

$

9,451

Platreef

121

49


1,662


498


245


81


45


57


57,572


121

49

$

1,662

$

498

$

245

$

81

$

45

$

57

$

67,023

Cobalt

















Voisey's Bay

403

661

$

26.09

$

4.98

$

8.74

$

17,258

$

8,188

$

13,517

$

200,954

Operating results








$

771,734

$

538,504

$

679,354

$

11,689,979

Other















General and administrative










$

(10,225)

$

(9,469)



Share based compensation











(13,528)


-



Donations and community investments











(3,740)


(3,935)



Finance costs












(25,097)


(23,562)



Other











1,761


2,540



Income tax












(77,427)


(72)



Total other









$

(128,256)

$

(34,498)

$

532,242












$

410,248

$

644,856

$

12,222,221

























1)

Units of gold, silver, palladium and platinum produced and sold are reported in ounces, while cobalt is reported in pounds. All figures in thousands except gold, palladium and platinum ounces produced and sold and per unit amounts.

2)

Quantity produced represents the amount of gold, silver, palladium, platinum and cobalt contained in concentrate or doré prior to smelting or refining deductions. Production figures are based on information provided by the operators of the mining operations to which the mineral stream interests relate or management estimates in those situations where other information is not available. Certain production figures may be updated in future periods as additional information is received.

3)

Refer to discussion on non-GAAP measure (iii) at the end of this press release.

4)

Includes the non-cash per ounce cost of sale associated with delay ounces. Please see the Company's MD&A for more information.

5)

Comprised of the operating Coleman, Copper Cliff, Garson, Creighton, Stobie and Totten gold interests and the non-operating Victor gold interest.

6)

Other gold interests comprised of the Copper World, Marmato, Santo Domingo, Fenix, El Domo, Marathon, Goose, Cangrejos, Curraghinalt, Kudz Ze Kayah, Koné, Kurmuk, Spring Valley, Hemlo and Jervois gold interests.

7)

Other silver interests comprised of the Los Filos, Zinkgruvan, Stratoni, Neves-Corvo, Aljustrel, El Alto, Copper World, Navidad, Marmato, Cozamin , El Domo, Mineral Park, Kudz Ze Kayah and Jervois silver interests.

 

Three Months Ended September 30, 2025


Units
Produced²

Units
Sold

Average
Realized
Price
($'s Per
Unit)

Average
Cash
Cost
($'s Per
Unit) 3

Average
Depletion
($'s Per
Unit) 4

Sales

Gain on
Disposal 5

Net
Earnings

Cash Flow
From
Operations

Total
Assets

Gold



















Salobo

66,997

55,768

$

3,467

$

429

$

404

$

193,363

$

-

$

146,909

$

169,447

$

2,654,535

Sudbury 6

4,852

4,729


3,563


400


1,399


16,850


-


8,342


6,305


223,690

Constancia

12,797

2,708


3,467


427


338


9,388


-


7,314


8,231


58,047

San Dimas

7,507

6,655


3,467


643


428


23,076


-


15,945


18,795


128,937

Stillwater

1,717

1,465


3,467


614


570


5,080


-


3,345


4,180


205,223

Blackwater

4,879

6,463


3,563


1,236


606


23,028


-


11,123


4,123


334,215

Platreef

-

-


n.a.


n.a.


n.a.


-


-


-


-


275,702

Other 7

1,194

1,156


3,471


455


1,367


4,012


85,724


87,630


3,486


825,419


99,943

78,944

$

3,481

$

515

$

497

$

274,797

$

85,724

$

280,608

$

214,567

$

4,705,768

Silver



















Peñasquito

2,087

1,609

$

39.29

$

4.56

$

5.09

$

63,205

$

-

$

47,683

$

55,870

$

216,421

Antamina

1,672

1,552


39.29


8.12


4.39


60,981


-


41,560


48,377


467,399

Constancia

577

275


39.29


6.30


6.43


10,806


-


7,307


9,074


155,341

Blackwater

166

137


41.69


7.45


7.55


5,692


-


3,644


3,030


168,535

Other 8

1,493

1,187


40.50


6.34


3.31


48,111


-


36,642


39,044


548,017


5,995

4,760

$

39.66

$

6.35

$

4.57

$

188,795

$

-

$

136,836

$

155,395

$

1,555,713

Palladium



















Stillwater

2,650

2,594

$

1,173

$

205

$

492

$

3,042

$

-

$

1,234

$

2,510

$

209,743

Platreef

-

-


n.a.


n.a.


n.a.


-


-


-


-


78,814


2,650

2,594

$

1,173

$

205

$

492

$

3,042

$

-

$

1,234

$

2,510

$

288,557

Platinum



















Marathon

-

-

$

n.a.

$

n.a.

$

n.a.

$

-

$

-

$

-

$

-

$

9,451

Platreef

-

-


n.a.


n.a.


n.a.


-


-


-


-


57,584


-

-

$

n.a.

$

n.a.

$

n.a.

$

-

$

-

$

-

$

-

$

67,035

Cobalt



















Voisey's Bay

604

529

$

18.19

$

3.44

$

9.02

$

9,623

$

-

$

3,034

$

8,546

$

220,250

Operating results








$

476,257

$

85,724

$

421,712

$

381,018

$

6,837,323

Other

















General and administrative












$

(10,424)

$

(6,720)



Share based compensation













(8,652)


-



Donations and community investments













(1,406)


(1,441)



Finance costs














(1,441)


(144)



Other













12,834


10,662



Income tax














(45,407)


(422)



Total other











$

(54,496)

$

1,935

$

1,582,195














$

367,216

$

382,953

$

8,419,518

1)

Units of gold, silver and palladium produced and sold are reported in ounces, while cobalt is reported in pounds. All figures in thousands except gold and palladium ounces produced and sold and per unit amounts.

2)

Quantity produced represents the amount of gold, silver, palladium and cobalt contained in concentrate or doré prior to smelting or refining deductions. Production figures are based on information provided by the operators of the mining operations to which the mineral stream interests relate or management estimates in those situations where other information is not available. Certain production figures may be updated in future periods as additional information is received.

3)

Refer to discussion on non-GAAP measure (iii) at the end of this press release.

4)

Includes the non-cash per ounce cost of sale associated with delay ounces. Please see the Company's MD&A for more information.

5)

The gain on disposal of Other gold interests relates to the gain on the buyback of 33% of the Cangrejos PMPA.

6)

Comprised of the operating Coleman, Copper Cliff, Garson, Creighton and Totten gold interests as well as the non-operating Stobie and Victor gold interests.

7)

Other gold interests comprised of the Marmato, Copper World, Santo Domingo, Fenix, El Domo, Marathon, Goose, Cangrejos, Curraghinalt, Kudz Ze Kayah, Koné and Kurmuk gold interests.

8)

Other silver interests comprised of the Los Filos, Zinkgruvan, Neves-Corvo, Marmato, Cozamin, Stratoni, Aljustrel, El Alto, Copper World, Navidad, El Domo, Mineral Park and Kudz Ze Kayah silver interests.

Comparative Results of Operations on a GEO Basis




Q3 2026  



Q3 2025  



Change  


Change

GEO Production 1, 2



230,965



203,835



27,131


13.3 %

GEO Sales 2



192,270



161,845



30,425


18.8 %

Average price per GEO sold 2


$

4,014


$

2,943


$

1,071


36.4 %

Revenue


$

771,734


$

476,257


$

295,477


62.0 %

Cost of sales, excluding depletion


$

105,337


$

74,303


$

(31,034)


(41.8) %

Depletion



127,893



65,966



(61,927)


(93.9) %

Cost of sales


$

233,230


$

140,269


$

(92,961)


(66.3) %

Gross margin


$

538,504


$

335,988


$

202,516


60.3 %

General and administrative



10,225



10,424



199


1.9 %

Share based compensation



13,528



8,652



(4,876)


(56.4) %

Donations and community investments



3,740



1,406



(2,334)


(166.0) %

Earnings from operations


$

511,011


$

315,506


$

195,505


62.0 %

Gain on disposal of mineral stream interests



-



85,724



(85,724)


n.a.

Other income (expense)



1,761



12,834



(11,073)


(86.3) %

Earnings before finance costs and income taxes     


$

512,772


$

414,064


$

98,708


23.8 %

Finance costs



25,097



1,441



(23,656)


(1,641.6) %

Earnings before income taxes


$

487,675


$

412,623


$

75,052


18.2 %

Income tax expense



77,427



45,407



(32,020)


(70.5) %

Net earnings


$

410,248


$

367,216


$

43,032


11.7 %

1)

Quantity produced represents the amount of gold, silver, palladium, platinum and cobalt contained in concentrate or doré prior to smelting or refining deductions. Production figures are based on information provided by the operators of the mining operations to which the mineral stream interests relate or management estimates in those situations where other information is not available. Certain production figures may be updated in future periods as additional information is received.

2)

GEOs, which are provided to assist the reader, are based on the following commodity price assumptions: $4,800 per ounce gold; $80.00 per ounce silver; $1,500 per ounce palladium; $2,000 per ounce platinum; and $25.00 per pound cobalt; consistent with those used in estimating the Company's production guidance for 2026.

 

Nine Months Ended September 30, 2026


Units 
Produced² 

Units 
Sold 

Average 
Realized 
Price 
($'s Per 
Unit) 

Average 
Cash Cost 
($'s Per 
Unit) 3 

Average 
Depletion 
($'s Per 
Unit) 4 

Sales 

Net 
Earnings 

Cash Flow 
From 
Operations 

Total 
Assets 

Gold

















Salobo

197,086

192,024

$

4,511

$

433

$

408

$

866,182

$

704,751

$

783,008

$

2,542,453

Sudbury 5

12,814

12,995


4,550


400


1,376


59,125


36,049


53,930


200,616

Constancia

10,715

16,720


4,675


429


337


78,174


65,353


70,997


46,641

San Dimas

19,899

21,065


4,529


647


433


95,418


72,678


81,791


116,105

Stillwater

4,054

4,268


4,511


820


563


19,252


13,352


15,753


201,800

Blackwater

16,443

16,525


4,530


1,562


612


74,865


38,944


49,398


320,936

Platreef

387

95


4,267


100


657


407


335


397


275,640

Other 6

18,050

19,448


4,544


879


1,220


88,369


47,548


71,268


1,726,029


279,448

283,140

$

4,527

$

550

$

520

$

1,281,792

$

979,010

$

1,126,542

$

5,430,220

Silver

















Peñasquito

7,422

6,149

$

72.47

$

4.62

$

4.97

$

445,673

$

386,673

$

417,262

$

176,277

Antamina

6,542

5,608


72.44


14.58


18.72


406,191


219,458


324,454


4,654,655

Constancia

1,673

1,639


74.60


6.33


6.52


122,248


101,190


111,872


140,721

Blackwater

559

410


70.46


12.95


8.11


28,835


20,219


23,653


164,184

Other 7

5,150

3,523


73.87


15.83


3.77


260,320


191,263


238,068


572,019


21,346

17,329

$

72.90

$

10.48

$

9.40

$

1,263,267

$

918,803

$

1,115,309

$

5,707,856

Palladium

















Stillwater

7,208

7,722

$

1,490

$

271

$

488

$

11,508

$

5,646

$

9,415

$

205,123

Platreef

155

34


1,326


392


324


45


21


31


78,803


7,363

7,756

$

1,490

$

272

$

487

$

11,553

$

5,667

$

9,446

$

283,926

Platinum

















Marathon

-

-

$

n.a.

$

n.a.

$

n.a.

$

-

$

-

$

-

$

9,451

Platreef

203

49


1,662


498


245


81


45


57


57,572


203

49

$

1,662

$

498

$

245

$

81

$

45

$

57

$

67,023

Cobalt

















Voisey's Bay

1,856

1,675

$

27.28

$

5.12

$

8.91

$

45,711

$

22,209

$

32,955

$

200,954

Operating results








$

2,602,404

$

1,925,734

$

2,284,309

$

11,689,979

Other















General and administrative










$

(34,524)

$

(40,413)



Share based compensation











(28,447)


(29,257)



Donations and community investments











(9,902)


(9,241)



Finance costs












(57,599)


(55,414)



Other











28,568


19,727



Income tax












(288,302)


(109,515)



Total other









$

(390,206)

$

(224,113)

$

532,242












$

1,535,528

$

2,060,196

$

12,222,221

1)

Units of gold, silver, palladium and platinum produced and sold are reported in ounces, while cobalt is reported in pounds. All figures in thousands except gold, palladium and platinum ounces produced and sold and per unit amounts.

2)

Quantity produced represents the amount of gold, silver, palladium, platinum and cobalt contained in concentrate or doré prior to smelting or refining deductions. Production figures are based on information provided by the operators of the mining operations to which the mineral stream interests relate or management estimates in those situations where other information is not available. Certain production figures may be updated in future periods as additional information is received.

3)

Refer to discussion on non-GAAP measure (iii) at the end of this press release.

4)

Includes the non-cash per ounce cost of sale associated with delay ounces. Please see the Company's MD&A for more information.

5)

Comprised of the operating Coleman, Copper Cliff, Garson, Creighton, Stobie and Totten gold interests and the non-operating Victor gold interest.

6)

Other gold interests comprised of the Copper World, Marmato, Santo Domingo, Fenix, El Domo, Marathon, Goose, Cangrejos, Curraghinalt, Kudz Ze Kayah, Koné, Kurmuk, Spring Valley, Hemlo and Jervois gold interests.

7)

Other silver interests comprised of the Los Filos, Zinkgruvan, Stratoni, Neves-Corvo, Aljustrel, El Alto, Copper World, Navidad, Marmato, Cozamin , El Domo, Mineral Park, Kudz Ze Kayah and Jervois silver interests.

 

Nine Months Ended September 30, 2025


Units
Produced²

Units
Sold

 


Average
Realized
Price
($'s Per
Unit)

 


Average
Cash
Cost
($'s Per
Unit) 3

 


Average
Depletion
($'s Per
Unit) 4

 


Sales

 


Gain on
Disposal 5

 


Net
Earnings

 


Cash Flow
From
Operations

 


Total
Assets

Gold



















Salobo

207,799

215,908

$

3,183

$

429

$

393

$

687,165

$

-

$

509,623

$

594,573

$

2,654,535

Sudbury 6

15,135

13,210


3,222


400


1,352


42,564


-


19,419


28,612


223,690

Constancia

22,277

19,323


3,112


425


325


60,140


-


45,649


51,928


58,047

San Dimas

22,910

22,852


3,186


640


330


72,808


-


50,643


58,187


128,937

Stillwater

4,710

4,798


3,182


560


466


15,268


-


10,345


12,582


205,223

Blackwater

9,946

9,864


3,490


1,212


610


34,426


-


16,454


11,552


334,215

Platreef

-

-


n.a.


n.a.


n.a.


-


-


-


-


275,702

Other 7

2,718

3,259


3,214


410


1,299


10,474


85,724


90,630


9,139


825,419


285,495

289,214

$

3,191

$

473

$

446

$

922,845

$

85,724

$

742,763

$

766,573

$

4,705,768

Silver



















Peñasquito

5,944

5,697

$

34.75

$

4.56

$

4.92

$

197,943

$

-

$

143,923

$

171,967

$

216,421

Antamina

4,201

3,509


35.79


7.30


6.66


125,595


-


76,600


99,973


467,399

Constancia

1,684

1,630


33.94


6.27


6.16


55,320


-


35,071


45,108


155,341

Blackwater

339

280


39.13


6.99


8.63


10,932


-


6,567


7,548


168,535

Other 8

4,102

2,995


36.60


5.20


4.59


109,683


-


80,356


85,075


548,017


16,270

14,111

$

35.40

$

5.62

$

5.50

$

499,473

$

-

$

342,517

$

409,671

$

1,555,713

Palladium



















Stillwater

7,746

7,626

$

1,046

$

184

$

451

$

7,978

$

-

$

3,137

$

6,573

$

209,743

Platreef

-

-


n.a.


n.a.


n.a.


-


-


-


-


78,814


7,746

7,626

$

1,046

$

184

$

451

$

7,978

$

-

$

3,137

$

6,573

$

288,557

Platinum



















Marathon

-

-

$

n.a.

$

n.a.

$

n.a.

$

-

$

-

$

-

$

-

$

9,451

Platreef

-

-


n.a.


n.a.


n.a.


-


-


-


-


57,584


-

-

$

n.a.

$

n.a.

$

n.a.

$

-

$

-

$

-

$

-

$

67,035

Cobalt



















Voisey's Bay

1,791

1,147

$

17.09

$

3.25

$

9.11

$

19,590

$

-

$

5,424

$

15,415

$

220,250

Operating results








$

1,449,886

$

85,724

$

1,093,841

$

1,198,232

$

6,837,323

Other

















General and administrative












$

(34,970)

$

(36,596)



Share based compensation













(30,795)


(17,209)



Donations and community investments













(6,466)


(6,416)



Finance costs













(4,309)


(3,330)



Other













30,090


27,628



Income tax














(133,920)


(3,604)



Total other











$

(180,370)

$

(39,527)

$

1,582,195














$

913,471

$

1,158,705

$

8,419,518

1)

Units of gold, silver and palladium produced and sold are reported in ounces, while cobalt is reported in pounds. All figures in thousands except gold and palladium ounces produced and sold and per unit amounts.

2)

Quantity produced represents the amount of gold, silver, palladium and cobalt contained in concentrate or doré prior to smelting or refining deductions. Production figures are based on information provided by the operators of the mining operations to which the mineral stream interests relate or management estimates in those situations where other information is not available. Certain production figures may be updated in future periods as additional information is received.

3)

Refer to discussion on non-GAAP measure (iii) at the end of this press release.

4)

Includes the non-cash per ounce cost of sale associated with delay ounces. Please see the Company's MD&A for more information.

5)

The gain on disposal of Other gold interests relates to the gain on the buyback of 33% of the Cangrejos PMPA.

6)

Comprised of the operating Coleman, Copper Cliff, Garson, Creighton and Totten gold interests as well as the non-operating Stobie and Victor gold interests.

7)

Other gold interests comprised of the Marmato, Copper World, Santo Domingo, Fenix, El Domo, Marathon, Goose, Cangrejos, Curraghinalt, Kudz Ze Kayah, Koné and Kurmuk gold interests.

8)

Other silver interests comprised of the Los Filos, Zinkgruvan, Neves-Corvo, Marmato, Cozamin, Stratoni, Aljustrel, El Alto, Copper World, Navidad, El Domo, Mineral Park and Kudz Ze Kayah silver interests.

Comparative Results of Operations on a GEO Basis




YTD 2026  



YTD 2025  



Change  


Change

GEO Production 1, 2



647,258



568,405



78,854


13.9 %

GEO Sales 2



583,129



532,756



50,373


9.5 %

Average price per GEO sold 2


$

4,463


$

2,721


$

1,742


64.0 %

Revenue


$

2,602,404


$

1,449,886


$

1,152,518


79.5 %

Cost of sales, excluding depletion


$

349,423


$

224,107


$

(125,316)


(55.9) %

Depletion



327,247



217,662



(109,585)


(50.3) %

Cost of sales


$

676,670


$

441,769


$

(234,901)


(53.2) %

Gross margin


$

1,925,734


$

1,008,117


$

917,617


91.0 %

General and administrative



34,524



34,970



446


1.3 %

Share based compensation



28,447



30,795



2,348


7.6 %

Donations and community investments



9,902



6,466



(3,436)


(53.1) %

Earnings from operations


$

1,852,861


$

935,886


$

916,975


98.0 %

Gain on disposal of mineral stream interests



-



85,724



(85,724)


n.a.

Other income (expense)



28,568



30,090



(1,522)


(5.1) %

Earnings before finance costs and income taxes     


$

1,881,429


$

1,051,700


$

829,729


78.9 %

Finance costs



57,599



4,309



(53,290)


(1,236.7) %

Earnings before income taxes


$

1,823,830


$

1,047,391


$

776,439


74.1 %

Income tax expense



288,302



133,920



(154,382)


(115.3) %

Net earnings


$

1,535,528


$

913,471


$

622,057


68.1 %

1)

Quantity produced represents the amount of gold, silver, palladium, platinum and cobalt contained in concentrate or doré prior to smelting or refining deductions. Production figures are based on information provided by the operators of the mining operations to which the mineral stream interests relate or management estimates in those situations where other information is not available. Certain production figures may be updated in future periods as additional information is received.

2)

GEOs, which are provided to assist the reader, are based on the following commodity price assumptions: $4,800 per ounce gold; $80.00 per ounce silver; $1,500 per ounce palladium; $2,000 per ounce platinum; and $25.00 per pound cobalt; consistent with those used in estimating the Company's production guidance for 2026.

Non-GAAP Measures

Wheaton has included, throughout this document, certain non-GAAP performance measures, including (i) adjusted net earnings and adjusted net earnings per share; (ii) operating cash flow per share (basic and diluted); (iii) average cash costs of gold, silver, palladium and platinum on a per ounce basis and cobalt on a per pound basis; (iv) cash operating margin; and (v) net debt.

i. Adjusted net earnings and adjusted net earnings per share are calculated by removing the effects of non-cash impairment charges (reversals) (if any), non-cash fair value (gains) losses and the non-cash accretion of interest on the 777 PMPA refundable deposit as well as the reversal of non-cash income tax expense (recovery) which is offset by income tax expense (recovery) recognized in the Statements of Shareholders' Equity and OCI, respectively. The Company believes that, in addition to conventional measures prepared in accordance with IFRS Accounting Standards, management and certain investors use this information to evaluate the Company's performance. 

The following table provides a reconciliation of adjusted net earnings and adjusted net earnings per share (basic and diluted).


Three Months Ended
September 30

Nine Months Ended
September 30

(in thousands, except for per share amounts)


2026


2025


2026


2025

Net earnings


$

410,248


$

367,216


$

1,535,528


$

913,471

Add back (deduct):













Gain on disposal of Mineral Stream Interest



-



(85,724)



-



(85,724)

Income tax expense related to disposal of Mineral Stream Interest



-



12,859



-



12,859

(Gain) loss on fair value adjustment of share purchase warrants held



(204)



(1,765)



232



(4,522)

Income tax (expense) recovery recognized in the Statement of Shareholders' Equity    



-



(1,152)



-



(1,152)

Deferred income tax (expense) recovery recognized in the Statement of OCI



-



(10,191)



-



(16,487)

Interest accretion on the 777 refundable deposit



(204)



(189)



(606)



(561)

Adjusted net earnings


$

409,840


$

281,054


$

1,535,154


$

817,884

Divided by:













Basic weighted average number of shares outstanding



454,171



453,967



454,117



453,850

Diluted weighted average number of shares outstanding



455,030



454,768



454,992



454,625

Equals:













Adjusted earnings per share - basic


$

0.902


$

0.619


$

3.381


$

1.802

Adjusted earnings per share - diluted


$

0.901


$

0.618


$

3.374


$

1.799

ii. Operating cash flow per share (basic and diluted) is calculated by dividing cash generated by operating activities by the weighted average number of shares outstanding (basic and diluted). The Company presents operating cash flow per share as management and certain investors use this information to evaluate the Company's performance in comparison to other companies in the precious metal mining industry who present results on a similar basis.

The following table provides a reconciliation of operating cash flow per share (basic and diluted).


Three Months Ended
September 30

Nine Months Ended
September 30

(in thousands, except for per share amounts)


2026


2025


2026


2025

Cash generated by operating activities


$

644,856


$

382,953


$

2,060,196


$

1,158,705

Divided by:













Basic weighted average number of shares outstanding



454,171



453,967



454,117



453,850

Diluted weighted average number of shares outstanding     



455,030



454,768



454,992



454,625

Equals:













Operating cash flow per share - basic


$

1.420


$

0.844


$

4.537


$

2.553

Operating cash flow per share - diluted


$

1.417


$

0.842


$

4.528


$

2.549

iii. Average cash cost of gold, silver, palladium and platinum on a per ounce basis and cobalt on a per pound basis is calculated by dividing the total cost of sales, less depletion and cost of sales related to delay ounces, by the ounces or pounds sold. In the precious metal mining industry, this is a common performance measure but does not have any standardized meaning prescribed by IFRS Accounting Standards. In addition to conventional measures prepared in accordance with IFRS Accounting Standards, management and certain investors use this information to evaluate the Company's performance and ability to generate cash flow.

The following table provides a calculation of average cash cost of gold, silver, palladium and platinum on a per ounce basis and cobalt on a per pound basis.


Three Months Ended
September 30

Nine Months Ended
September 30

(in thousands, except for gold, palladium and platinum     
ounces sold and per unit amounts)


2026


2025


2026


2025

Cost of sales


$

233,230


$

140,269


$

676,670


$

441,769

Less:  depletion



(127,893)



(65,966)



(327,247)



(217,662)

Less:  cost of sales related to delay ounces 1



-



(1,071)



(1,514)



(2,944)

Cash cost of sales


$

105,337


$

73,232


$

347,909


$

221,163

Cash cost of sales is comprised of:













Total cash cost of gold sold


$

50,509


$

40,659


$

155,595


$

136,686

Total cash cost of silver sold



50,855



30,223



181,605



79,345

Total cash cost of palladium sold



658



532



2,106



1,405

Total cash cost of platinum sold



24



-



24



-

Total cash cost of cobalt sold



3,291



1,818



8,579



3,727

Total cash cost of sales


$

105,337


$

73,232


$

347,909


$

221,163

Divided by:













Total gold ounces sold



91,969



78,944



283,140



289,214

Total silver ounces sold



5,758



4,760



17,329



14,111

Total palladium ounces sold



2,781



2,594



7,756



7,626

Total platinum ounces sold



49



-



49



-

Total cobalt pounds sold



661



529



1,675



1,147

Equals:













Average cash cost of gold (per ounce)


$

549


$

515


$

550


$

473

Average cash cost of silver (per ounce)


$

8.83


$

6.35


$

10.48


$

5.62

Average cash cost of palladium (per ounce)


$

236


$

205


$

272


$

184

Average cash cost of platinum (per ounce)


$

498


$

n.a.


$

498


$

n.a.

Average cash cost of cobalt (per pound)


$

4.98


$

3.44


$

5.12


$

3.25

1)

The cost of sales related to delay ounces is a non-cash expense. Please see the Company's MD&A for more information.

iv. Cash operating margin is calculated by adding back depletion and the cost of sales related to delay ounces to the gross margin. Cash operating margin on a per ounce or per pound basis is calculated by dividing the cash operating margin by the number of ounces or pounds sold during the period. The Company presents cash operating margin as management and certain investors use this information to evaluate the Company's performance in comparison to other companies in the precious metal mining industry who present results on a similar basis as well as to evaluate the Company's ability to generate cash flow. 

The following table provides a reconciliation of cash operating margin.


Three Months Ended
September 30

Nine Months Ended
September 30

(in thousands, except for gold, palladium and platinum ounces     
sold and per unit amounts)


2026


2025


2026


2025

Gross margin


$

538,504


$

335,988


$

1,925,734


$

1,008,117

Add back:  depletion



127,893



65,966



327,247



217,662

Add back:  cost of sales related to delay ounces 1



-



1,071



1,514



2,944

Cash operating margin


$

666,397


$

403,025


$

2,254,495


$

1,228,723

Cash operating margin is comprised of:













Total cash operating margin of gold sold


$

342,461


$

234,138


$

1,126,197


$

786,159

Total cash operating margin of silver sold



306,883



158,572



1,081,662



420,128

Total cash operating margin of palladium sold



3,029



2,510



9,447



6,573

Total cash operating margin of platinum sold



57



-



57



-

Total cash operating margin of cobalt sold



13,967



7,805



37,132



15,863

Total cash operating margin


$

666,397


$

403,025


$

2,254,495


$

1,228,723

Divided by:













Total gold ounces sold



91,969



78,944



283,140



289,214

Total silver ounces sold



5,758



4,760



17,329



14,111

Total palladium ounces sold



2,781



2,594



7,756



7,626

Total platinum ounces sold



49



-



49



-

Total cobalt pounds sold



661



529



1,675



1,147

Equals:













Cash operating margin per gold ounce sold


$

3,724


$

2,966


$

3,977


$

2,718

Cash operating margin per silver ounce sold


$

53.30


$

33.31


$

62.42


$

29.78

Cash operating margin per palladium ounce sold


$

1,090


$

968


$

1,218


$

862

Cash operating margin per platinum ounce sold


$

1,164


$

n.a.


$

1,164


$

n.a.

Cash operating margin per cobalt pound sold


$

21.11


$

14.75


$

22.16


$

13.84

1)

The cost of sales related to delay ounces is a non-cash expense. Please see the Company's MD&A for more information.

v. Net debt is calculated by subtracting cash and cash equivalents from the outstanding bank debt under the Revolving Credit Facility and the Term Loan. The Company presents net debt as management and certain investors use this information to evaluate the Company's liquidity and financial position.

The following table provides a calculation of the Company's net debt.


As at 
September 30 

As at 
December 31 

(in thousands)

2026

2025

Bank debt

$

1,597,518

$

-

Less: cash and cash equivalents     


(145,802)


(1,153,593)

Net debt (net cash)

$

1,451,716

$

(1,153,593)

These non-GAAP measures do not have any standardized meaning prescribed by IFRS Accounting Standards, and other companies may calculate these measures differently.  The presentation of these non-GAAP measures is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS Accounting Standards. For more detailed information, please refer to Wheaton's MD&A available on the Company's website at www.wheatonpm.com and posted on SEDAR+ at www.sedarplus.ca.

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS

This press release contains "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of applicable Canadian securities legislation concerning the business, operations and financial performance of Wheaton and, in some instances, the business, mining operations and performance of Wheaton's Precious Metals Purchase Agreement ("PMPA") counterparties. Forward-looking statements, which are all statements other than statements of historical fact, include, but are not limited to, statements with respect to:

Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "projects", "intends", "anticipates" or "does not anticipate", or "believes", "potential", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Wheaton to be materially different from those expressed or implied by such forward-looking statements, including but not limited to:

Forward-looking statements are based on assumptions management currently believes to be reasonable, including but not limited to:

Although Wheaton has attempted to identify important factors that could cause actual results, level of activity, performance or achievements to differ materially from those contained in forward‑looking statements, there may be other factors that cause results, level of activity, performance or achievements not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate and even if events or results described in the forward-looking statements are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on, Wheaton. Accordingly, readers should not place undue reliance on forward-looking statements and are cautioned that actual outcomes may vary. The forward-looking statements included herein are for the purpose of providing readers with information to assist them in understanding Wheaton's expected financial and operational performance and may not be appropriate for other purposes. Any forward-looking statement speaks only as of the date on which it is made, reflects Wheaton's management's current beliefs based on current information and will not be updated except in accordance with applicable securities laws.

Cautionary Language Regarding Reserves and Resources

For further information on Mineral Reserves and Mineral Resources and on Wheaton more generally, readers should refer to Wheaton's Annual Information Form for the year ended December 31, 2025, which was filed on March 31, 2026 and other continuous disclosure documents filed by Wheaton since January 1, 2026, available on SEDAR+ at www.sedarplus.ca. Wheaton's Mineral Reserves and Mineral Resources are subject to the qualifications and notes set forth therein. Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability.

Cautionary Note to United States Investors Concerning Estimates of Measured, Indicated and Inferred Resources: The information contained herein has been prepared in accordance with the requirements of the securities laws in effect in Canada, which differ from the requirements of United States securities laws. The Company reports information regarding mineral properties, mineralization and estimates of mineral reserves and mineral resources in accordance with Canadian reporting requirements which are governed by, and utilize definitions required by,  Canadian National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101") and the Canadian Institute of Mining, Metallurgy and Petroleum (the "CIM") – CIM Definition Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council, as amended (the "CIM Standards"). These definitions differ from the definitions adopted by the United States Securities and Exchange Commission ("SEC") under the United States Securities Act of 1933, as amended (the "Securities Act") which are applicable to U.S. companies. Accordingly, there is no assurance any mineral reserves or mineral resources that the Company may report as "proven mineral reserves", "probable mineral reserves", "measured mineral resources", "indicated mineral resources" and "inferred mineral resources" under NI 43-101 would be the same had the Company prepared the reserve or resource estimates under the standards adopted by the SEC. Accordingly, information contained herein that describes Wheaton's mineral deposits may not be comparable to similar information made public by U.S. companies subject to reporting and disclosure requirements under the United States federal securities laws and the rules and regulations thereunder. United States investors are urged to consider closely the disclosure in Wheaton's Form 40-F, a copy of which may be obtained from Wheaton or from https://www.sec.gov/edgar.shtml.

End Notes

1Please refer to disclosure on non-GAAP measures in this press release. Details of the dividend can be found in Wheaton's news release dated November 5, 2026, titled "Wheaton Precious Metals Announces Quarterly Dividend."

2Statements made in this section contain forward-looking information with respect to forecast production, production growth, funding outstanding commitments, continuing to acquire accretive mineral stream interests and the commencement, timing and achievement of construction, expansion or improvement projects and readers are cautioned that actual outcomes may vary. Please see "Cautionary Note Regarding Forward-Looking Statements" for material risks, assumptions and important disclosure associated with this information.

3Other metals in gold equivalent ounces ("GEOs") includes palladium, platinum and cobalt. Gold equivalent ounces ("GEOs") for 2026 and long-term guidance are calculated by converting silver, palladium, platinum and cobalt to a gold equivalent by using the following commodity price assumptions: $4,800 per ounce gold, $80 per ounce silver, $1,500 per ounce palladium, $2,000 per ounce platinum, and $25 per pound cobalt.

4Source: Company reports S&P Global estimates of 2026-2030 byproduct cost curves for gold, zinc/lead, copper, PGM, nickel & silver mines 

5Total streaming and royalty agreements relate to precious metals purchase agreements for the purchase of precious metals and cobalt relating to 22 mining assets which are currently operating, 20 of which are at various stages of development, and 15 of which are in various stages of exploration (with exploration assets including three which have been placed in care and maintenance or have been closed).

6Further details for long-term guidance can be found in the Wheaton news release dated February 16, 2026, titled "Wheaton Precious Metals Exceeds 2025 Production Guidance and Provides 2026 and Long-Term Outlook, Projecting Approximately 50% Growth to 1.2 Million Gold Equivalent Ounces by 2030."

7Wheaton's long-term production outlook is based on information available as of February 16, 2026, the date of publication.

Cision View original content:https://www.prnewswire.com/news-releases/wheaton-precious-metals-announces-third-quarter-2026-results-and-record-year-to-date-production-sales-volume-revenue-earnings-and-cash-flow-302931280.html

SOURCE Wheaton Precious Metals Corp.